De-Installation of the Virgin and Child and 9th Commandment Window

BBC cameras at the ready

 Practising

BBC cameras at the ready

Practice makes perfect – using a cardboard mock-up

 Preparing Top Window  BBC Interview

Preparing the top panel for removal

Marie being interviewed before the de-installation

 Top Panel Down 1  Top Panel Down 2

The top panel comes down

First Panel safely down and recorded on camera – no pressure then!

 Middle Panel Down 1  Middle Panel Down 2

Now the big panel comes down

One small step for man, one giant leap for a Boppard panel

 Middle Panel Trolley  Middle Panel Protect

Phew – The panel has landed!

Megan protects the panel – nothing escapes the camera!

 Bottom Panel Down 1  Bottom Panel Down 2

Kenny and Andrew at work on the final panel

And here it comes…

 Bottom Panel Transport  De-Brief

Preparing the final panel for transport

Final debrief

 BBC Monitor  All Down

Job well done – and all recorded on camera

Only one Boppard window left on display (on the right)

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s